Projects

Our Milestone Projects

1. ASHTAMGAM AYURVEDA VIDYA PEEDOM & RESEARCH CENTER , VAVANOOR, PALAKKAD

20 kw ongrid solar power plant.

This is the first project from which kseb started to buy back excess energy produced from a solar plant in private sector. based on this project kseb implemented net metering system.

2. MES COLLEGE OF ENGINEERING , KUTTIPPURAM

20 kw Solar station as the part of 100 KW grid tie solar system at MES Engineering College Kuttippuram

Also Designer of 600 KW grid-tie Solar Plant in MES Medical College; Perinthalmanna; Malappuram.

3. SREEPATHY INSTITUTE OF MANAGEMENT AND TECHNOLOGY KOOTTANAD; PALAKKAD

Campus lighting from solar power using hybrid solar inverter .

4. PRIYADARSINI COLLEGE, MALAPPURAM

Eco friendly campus without electricity working 24 x 7 under solar energy only.

10 kw Off-grid solar power plant.

5. PERUMBAYIL  AYURVEDAMANA ; GURUVAYOOOR 

Outdoor lighting running from natural energy using special hybrid solar unit

6.Automated  Residence at Palakkad of Dr. Sunil Pisharody (EMS Hospital Perinthalmanna)

5 KVA Hybrid solar system

Scroll to Top